Houses For Sale For Alamo Heights HS

Dated: 03/19/2016

Views: 294

ALAMO HEIGHTS HIGH SCHOOL

Alamo Heights High School 
is known for its excellence as a college preparatory high school where students benefit from a challenging educational program and a wide array of 
extra-curricular opportunities.

Live Honorably - Act Humbly - Model Dignity

History

The first Alamo Heights High School was opened in 1909. It was a two-room frame building in front of the site of the present Cambridge Elementary School building. In 1912, a new school on the same location contained eight rooms and an auditorium. In 1922, the first high school building was finished and was under supervision of the County Superintendent of Schools. The first graduating class from the high school, in May of 1925, had sixteen graduates. In 1928, the elementary and junior schools were built on the same site. In 1937, a 21-acre tract of land at Broadway and E. Castano was purchased; a new high school would be erected on that land. Soon, the football stadium and tennis courts were on the new grounds. Plans were started before 1941, but they were laid aside. Preliminary drawings of the school began in 1942; many meetings and inspection trips to other schools followed. On April 4, 1948, the bond issue passed by a vote of 3 to 1. Teachers submitted plans for their rooms and the facilities that they would need. A study of the educational needs of the community was made. Construction of the gymnasium began in January of 1949; work on the school started in June of 1949. The homemaking cottage was started in September. The school building was completed and opened for public use in September of 1950. During the late winter of 1956, construction was started on the north wing of the main building, vocal, music and speech rooms, and the auxiliary gymnasium. These facilities were ready for use at the beginning of the next school year. Extensive remodeling of the central wing to increase and improve the science and foreign language laboratories, an addition to the library, and the construction of the south wing were started during the summer of 1960 and were completed early in the spring of 1961. The demonstration-lecture room of the cottage was added during the summer of 1963. An extension to the north wing, additional dressing facilities for physical education, and stadium improvements were completed during the 1964-65 school year. New lights were placed on the football field in 1968, and the natatorium and air conditioning of all classroom buildings were completed during the 1969-70 school year. In 1989, 1998, 2000, 2005 and 2010 Alamo Heights patrons approved bond elections to provide improvements and additions to the high school and all district buildings.

6900 Broadway, San Antonio, TX 78209
Phone 210-820-8850 | Fax 210-832-5777


CLICK on the LOGO to see Homes for Sale in Alamo Heights

Image title


Nora Uriostegui

I work hard to provide my clients with the most positive Real Estate experience possible. A vital part of today's real estate industry is technology and to that end I provide my clients with state-of-....

Want to Advertise on this Site?

Latest Blog Posts

Why Real Estate Investing Makes Dollars And Sense

Why Real Estate Investing Makes (Dollars and) SenseINTRODUCTIONTurn on the television or scroll through Facebook, and chances are you’ll see at least one advertisement for a

Read More

From I Do To Sold

Newlyweds are saying "I do" to each other and then to their dream homes. It makes sense! When you put two hearts together, the time comes to find a home to nourish that love. A home that brings

Read More

You May Be Closer To Qualifying For A Home Than You Know

We have some great news for you if you are dreaming of owning a home but think you might not qualify or have the cash you need.This is a really great time to buy. Interest rates are still low and

Read More

Debunking Myths To Home Buying

Finally ready to make the transition into home ownership? That's awesome, and in this exciting time you can be turning to friends and family for an insight into the process. However, there seems to

Read More